Projects for FY'02 & FY'03
| |
FY 02
|
|
FY 03 Proposed
|
|
Vice
President's Recommendations |
| Major
Capital |
HWLLC |
$27,784,000.00 |
HWLLC |
$27,784,000.00 |
1 |
| |
ECCEL |
$19,983,754.00 |
ECCEL |
$20,270,316.00 |
2 |
| |
|
|
Student
Recreation Center |
$34,493,738.00 |
3 |
| |
|
|
|
|
|
| Minor
Capital |
Electrical
Upgrade |
$3,405,393.00 |
|
|
|
| |
Callaway
Addition |
$4,994,111.00 |
Callaway
Addition |
$4,994,111.00 |
1 |
| |
|
|
|
|
|
| |
Original
Amount |
$2,459,668.00 |
|
|
|
| |
Amount
Reduced by BOR |
$209,863.00 |
|
|
|
| |
Net MRR
Amount |
$2,168,805.00 |
|
|
|
| MRR |
|
|
|
|
|
| Special |
TLC |
$800,000.00 |
|
|
|
| |
|
|
|
|
|
| |
|
|
|
|
|
| Regular
Projects |
Renovations
to Martha Munro Ph2 |
$848,381.00 |
|
|
|
|
*1
|
Renovation
of Several Academic Depts. |
$101,775.00 |
|
|
|
| |
A/C
for Information Data Closets |
$136,186.00 |
|
|
|
|
*2
|
Renovations
to Pub and Printing |
$15,000.00 |
|
|
|
| |
Renovation
to Callaway, Geosciences & Geography |
$200,000.00 |
|
|
|
| |
HVAC Replacement
at Education Center |
0 |
HVAC Replacement
at Education Center |
$904,294.00 |
1 |
| |
Richards
College of Bus.-Building Systems Replacement |
0 |
Richards
College of Bus.-Building Systems Replacement |
$903,773.00 |
2 |
| |
Mechanical
Renovations to Library, Pafford & Boyd |
0 |
Mechanical
Renovations to Library, Pafford & Boyd |
$953,907.00 |
3 |
| |
|
|
Renovations to
Publications and Printing |
$192,800.00 |
|
| |
|
|
Biology Roof
Replacement |
$647,379.00 |
|
| |
|
|
Old Auditorium
Roof Replacement |
$129,269.00 |
|
| |
|
|
Performing Arts
Center Roof Replacement |
$99,715.00 |
|
| |
|
|
Boyd Building
Roof Replacement |
$238,501.00 |
|
| |
|
|
Education Center
Roof Replacement |
$544,420.00 |
|
| Regulatory Projects |
|
|
|
|
|
|
*3
|
Improvement
of Indoor Air Quality at Facilities |
$58,187.00 |
|
|
|
|
*4
|
Renovation
of Hazardous Waste Storage Building |
$30,000.00 |
|
|
|
| |
Laboratory Fume-hood
certification program |
0 |
|
|
|
| $37,733.00 funded |
Hazardous
Waste Removal from Biology-Chemistry |
$42,639.00 |
|
|
|
| |
Building Evacuation
Plans, Campus Wide |
0 |
|
|
|
| |
Replacement of
Emerg. & Exit Lighting for Ed. Ctr. |
0 |
Replacement of
Emerg. & Exit Lighting for Ed. Ctr. |
$55,000.00 |
1 |
| |
|
|
Emergency Notification
System for Labs |
$11,000.00 |
2 |
| |
|
|
Parker Elevator
Addition (ADA) |
$278,188.00 |
3 |
| |
Total MRR Amount |
$2,168,805.00 |
Mandeville Elevator Addition
(ADA) |
$204,058.00 |
4 |
| |
|
|
Renovation of
Hazardous Waste Storage Building |
$10,000.00 |
|
|
Institutional Funds |
Lighting-Intramural
Fields |
$80,435.00 |
Callaway Building
Renovation |
$147,777.00 |
|
| |
Intramural
Signage |
$7,329.00 |
Cashen Recital
Hall |
$19,378.83 |
|
| |
Library
Carpet Bid Overage |
$12,490.00 |
Choral Rehearsal
Room |
$70,190.00 |
|
| |
Jaeger
Historic Preservation |
$30,000.00 |
Class Keyboard
Lab-Humanities |
$31,271.00 |
|
| |
Aycock Stair Treads |
$8,810.00 |
Chemistry Studio-Ceiling Tiles for Sound Management |
$3,300.00 |
|
| |
Aycock Signage |
$4,307.00 |
Chemistry Studio-Light Control at Lectern |
$4,400.00 |
|
| |
Substation (Rodent Proof) |
$15,210.00 |
Chemistry Studio-Digital Elmo |
$4,400.00 |
|
| |
Fire Alarm-Melson Hall |
$6,955.00 |
Chemistry Studio-Addition of a Hood in 3-109 |
$17,000.00 |
|
| |
Aycock Furniture |
$3,430.00 |
Chemistry Studio-High Purity Water Supply |
$8,343.00 |
|
| |
Facilities Roof |
$98,221.00 |
Richards College of Bus-Update Telephone System |
$33,000.00 |
|
| |
Additional Speed Humps |
$98,560.00 |
Richard College of Bus-Remove Wall Between Rooms 38 &
39 |
$2,750.00 |
|
| |
Aycock-Ductwork, Ofc Areas, Glass |
$2,318.00 |
Richards College of Bus-Remove Wall Between 135 & 136 |
$5,500.00 |
|
| |
Field #9-Sprinkler System |
$9,000.00 |
Gunn Hall Renovation |
$283,250.00 |
|
| |
Asphalt |
$30,000.00 |
Newnan Campus-Paint Interior Walls, General Maint. & Repair |
$6,000.00 |
|
| |
Concrete |
$50,750.00 |
Newnan Campus-Renovate Interior of Warehouse Facility |
$75,000.00 |
|
| |
TLC Renovations/Research Lab |
$6,150.00 |
Newnan Campus-Renovate Parking Lot, Extend Boundaries |
$10,000.00 |
|
| |
ALC Energy Management Contract |
$15,000.00 |
Newnan Campus-Repair Tar and Gravel Roof on Block Building |
$8,000.00 |
|
| |
Master Plan Signage |
$46,700.00 |
Newnan Campus-Seal and Re-Line Main Parking Lot |
$6,000.00 |
|
| |
|
|
Newnan Campus-Paint Exterior, General Maint./Block Building |
$6,000.00 |
|
| |
|
|
Construct Photography Studio on-site at PR Office |
$39,600.00 |
|
| |
|
|
Install Card Access System at Old Auditorium |
$15,840.00 |
|
| |
|
|
Intramural Field-Add Bleachers |
$16,500.00 |
|
| |
|
|
Additional Speed Humps |
$75,000.00 |
|
| |
|
|
Upgrading Energy Mgt. Controls-Campus Wide |
$85,000.00 |
|
| |
|
|
Additional Asphalt Needs |
$30,000.00 |
|
| |
|
|
Additional Concrete Needs |
$50,000.00 |
|
| |
|
|
Energy Projects (Lighting Upgrades) |
$147,000.00 |
|
| |
|
|
Professional Services |
$125,000.00 |
|
| |
|
|
Upgrade Irrigation (Fields 1,8,Baseball) |
$27,000.00 |
|
| |
|
|
Public Safety Relocation-Residence Hall |
$100,000.00 |
|
| |
|
|
Renovation to Admissions |
$127,721.00 |
|
| |
|
|
Replace Humanities Boiler |
$94,000.00 |
|
| |
|
|
Replace Biology Boiler |
$94,000.00 |
|
| *1--Available balance to be used to support interim
needs at Printing and Publications |
|
Replace Melson Boiler |
$58,000.00 |
|
| *2--Funded for design |
|
|
|
|
| *3--Project placed on hold-BOR re-allocation-funded
for design |
|
|
|
|
| *4--Project placed on hold-BOR re-allocation |
|
|
|
|
|