Projects for FY'02 & FY'03

 

 

FY 02


 

FY 03 Proposed


  Vice President's Recommendations
Major Capital HWLLC $27,784,000.00 HWLLC $27,784,000.00 1
  ECCEL $19,983,754.00 ECCEL $20,270,316.00 2
      Student Recreation Center $34,493,738.00 3
           
Minor Capital Electrical Upgrade $3,405,393.00      
  Callaway Addition $4,994,111.00 Callaway Addition $4,994,111.00 1
           
  Original Amount $2,459,668.00      
  Amount Reduced by BOR $209,863.00      
  Net MRR Amount $2,168,805.00      
MRR          
Special TLC $800,000.00      
           
           
Regular Projects Renovations to Martha Munro Ph2 $848,381.00      

*1

Renovation of Several Academic Depts. $101,775.00      
  A/C for Information Data Closets $136,186.00      

*2

Renovations to Pub and Printing $15,000.00      
  Renovation to Callaway, Geosciences & Geography $200,000.00      
  HVAC Replacement at Education Center 0 HVAC Replacement at Education Center $904,294.00 1
  Richards College of Bus.-Building Systems Replacement 0 Richards College of Bus.-Building Systems Replacement $903,773.00 2
  Mechanical Renovations to Library, Pafford & Boyd 0 Mechanical Renovations to Library, Pafford & Boyd $953,907.00 3
      Renovations to Publications and Printing $192,800.00  
      Biology Roof Replacement $647,379.00  
      Old Auditorium Roof Replacement $129,269.00  
      Performing Arts Center Roof Replacement $99,715.00  
      Boyd Building Roof Replacement $238,501.00  
      Education Center Roof Replacement $544,420.00  
Regulatory Projects          

*3

Improvement of Indoor Air Quality at Facilities $58,187.00      

*4

Renovation of Hazardous Waste Storage Building $30,000.00      
  Laboratory Fume-hood certification program 0      
$37,733.00 funded Hazardous Waste Removal from Biology-Chemistry $42,639.00      
  Building Evacuation Plans, Campus Wide 0      
  Replacement of Emerg. & Exit Lighting for Ed. Ctr. 0 Replacement of Emerg. & Exit Lighting for Ed. Ctr. $55,000.00 1
      Emergency Notification System for Labs $11,000.00 2
      Parker Elevator Addition (ADA) $278,188.00 3
  Total MRR Amount $2,168,805.00 Mandeville Elevator Addition (ADA) $204,058.00 4
      Renovation of Hazardous Waste Storage Building $10,000.00  
Institutional Funds Lighting-Intramural Fields $80,435.00 Callaway Building Renovation $147,777.00  
  Intramural Signage $7,329.00 Cashen Recital Hall $19,378.83  
  Library Carpet Bid Overage $12,490.00 Choral Rehearsal Room $70,190.00  
  Jaeger Historic Preservation $30,000.00 Class Keyboard Lab-Humanities $31,271.00  
  Aycock Stair Treads $8,810.00 Chemistry Studio-Ceiling Tiles for Sound Management $3,300.00  
  Aycock Signage $4,307.00 Chemistry Studio-Light Control at Lectern $4,400.00  
  Substation (Rodent Proof) $15,210.00 Chemistry Studio-Digital Elmo $4,400.00  
  Fire Alarm-Melson Hall $6,955.00 Chemistry Studio-Addition of a Hood in 3-109 $17,000.00  
  Aycock Furniture $3,430.00 Chemistry Studio-High Purity Water Supply $8,343.00  
  Facilities Roof $98,221.00 Richards College of Bus-Update Telephone System $33,000.00  
  Additional Speed Humps $98,560.00 Richard College of Bus-Remove Wall Between Rooms 38 & 39 $2,750.00  
  Aycock-Ductwork, Ofc Areas, Glass $2,318.00 Richards College of Bus-Remove Wall Between 135 & 136 $5,500.00  
  Field #9-Sprinkler System $9,000.00 Gunn Hall Renovation $283,250.00  
  Asphalt $30,000.00 Newnan Campus-Paint Interior Walls, General Maint. & Repair $6,000.00  
  Concrete $50,750.00 Newnan Campus-Renovate Interior of Warehouse Facility $75,000.00  
  TLC Renovations/Research Lab $6,150.00 Newnan Campus-Renovate Parking Lot, Extend Boundaries $10,000.00  
  ALC Energy Management Contract $15,000.00 Newnan Campus-Repair Tar and Gravel Roof on Block Building $8,000.00  
  Master Plan Signage $46,700.00 Newnan Campus-Seal and Re-Line Main Parking Lot $6,000.00  
      Newnan Campus-Paint Exterior, General Maint./Block Building $6,000.00  
      Construct Photography Studio on-site at PR Office  $39,600.00  
      Install Card Access System at Old Auditorium $15,840.00  
      Intramural Field-Add Bleachers $16,500.00  
      Additional Speed Humps $75,000.00  
      Upgrading Energy Mgt. Controls-Campus Wide $85,000.00  
      Additional Asphalt Needs $30,000.00  
      Additional Concrete Needs $50,000.00  
      Energy Projects (Lighting Upgrades) $147,000.00  
      Professional Services $125,000.00  
      Upgrade Irrigation (Fields 1,8,Baseball) $27,000.00  
      Public Safety Relocation-Residence Hall $100,000.00  
      Renovation to Admissions $127,721.00  
      Replace Humanities Boiler $94,000.00  
      Replace Biology Boiler $94,000.00  
*1--Available balance to be used to support interim needs at Printing and Publications   Replace Melson Boiler $58,000.00  
*2--Funded for design        
*3--Project placed on hold-BOR re-allocation-funded for design        
*4--Project placed on hold-BOR re-allocation        